Skip to content

SASO and SABER requirements for lighting poles

In Saudi Arabia, product conformity runs through SASO, the Saudi Standards, Metrology and Quality Organization, and its SABER platform, where products are registered and conformity and shipment certificates are issued. A street lighting supply has two parts to check: the steel pole and the luminaire it carries. Requirements change, so confirm them for each shipment.

Published by BSI on 31 October 2026

SASO and SABER: who does what

SASO issues the technical regulations and standards that products must meet in the Kingdom. SABER is its electronic platform for registering products and obtaining conformity certificates before goods enter the Saudi market. SABER is integrated with Fasah, the customs platform, so the conformity certificate is checked electronically when the customs declaration is issued, and SABER warns that a shipment without the required certificates risks being re-exported.

The frame was set by SASO in 2021: importers register their products on SABER; products within the scope of an applied technical regulation must meet its requirements; and products not covered by a regulation need a self-declaration. SABER's own shipment guide follows the same split.

Two certificates matter on a project. The product certificate of conformity covers a registered product and is issued through a conformity assessment body. The shipment certificate covers a consignment of imported products: SABER lists the regulated products that hold a valid certificate of conformity and the non-regulated products that hold a self-declaration, and sends the request to the conformity assessment body that issued the product certificate; for regulated products, no shipment certificate is issued without its approval. At the time of writing, SABER states that the shipment certificate's validity has been extended from 60 to 90 days.

The pole: Gulf standards for steel lighting poles

Two Gulf standards describe steel poles. GSO 1610:2002, Steel lighting poles and their testing methods, covers poles of tapered octagonal or round section made from steel sheet that is bent and welded lengthwise, from 6 m to 18 m nominal height, with or without a bracket, and the methods for testing them. GSO EN 40-5:2011, the Gulf adoption of the European standard for steel lighting columns, covers post-top columns up to 20 m and bracket columns up to 18 m, with performance requirements for resistance to horizontal (wind) loads and for impact.

The project specification states which of these applies. Separately, SASO's Technical Regulation for Building Materials, Part 1, covering metals and their alloys for construction, became mandatory on 26 June 2020 for products such as steel bars, steel wire mesh and steel sheets, and made the Saudi Quality Mark mandatory for the products it covers. Whether a particular pole falls within a technical regulation depends on how the product is classified, so check it on SABER or with a conformity assessment body before ordering.

The luminaire: energy efficiency rules

The light fitting on the pole is a lighting product with its own rules. SASO lists SASO 2927, Lighting Products Part 3, among the products with energy efficiency labels under the general regulation for energy consumption efficiency, alongside SASO 2870 (Part 1) and SASO 2902 (Part 2). SASO's 2020 workshop material on SASO 2927 presented it as the street lighting standard, covering the classification of road lighting, tunnel lighting, and requirements for energy efficiency, performance, mechanical and electrical properties and labelling, with enforcement from 1 June 2020. Confirm the current edition and label requirements for the luminaire model being supplied.

Documents to check

Documents to check for a lighting pole supply
ItemDocumentWhat it covers
Steel poleGSO 1610:2002Steel lighting poles from 6 m to 18 m and their test methods
Steel poleGSO EN 40-5:2011Steel lighting columns: wind load and impact performance
Construction steelSASO Technical Regulation for Building Materials, Part 1Metals and alloys for construction; mandatory since 26 June 2020
LuminaireSASO 2927 (Lighting Products, Part 3)Street lighting: energy efficiency, performance and labelling
Each consignmentSABER shipment certificateThe products in that shipment, against their certificates or self-declarations

How compliance is handled on a project

  1. List every product in the supply: pole, bracket and luminaire.
  2. For each one, check on SABER whether a technical regulation applies.
  3. For regulated products, obtain the product certificate of conformity through a conformity assessment body; for products outside any regulation, file the self-declaration.
  4. Raise the shipment certificate for each consignment before it ships.
  5. Keep the certificates and test reports in the handover file, since tender and handover documents may call for them.

BSI supplies lighting poles to SASO requirements, with engineered load calculations, and can deliver them in the same scope as canopies and shades.

Questions, answered.

What is SABER?

SABER is SASO's electronic platform for registering products and obtaining conformity certificates before goods enter the Saudi market. It issues product certificates of conformity and shipment certificates, and it is integrated with Fasah, the customs platform, so certificates are checked electronically at customs.

Do imported lighting poles need a SABER certificate?

Imported products are cleared with a shipment certificate on SABER for the consignment. Regulated products need a valid product certificate of conformity first; products outside any technical regulation need a self-declaration. Whether a given pole is regulated depends on its classification, so confirm it on SABER for each product and each shipment.

Which standards cover steel lighting poles?

Two Gulf standards: GSO 1610:2002 for steel lighting poles from 6 m to 18 m and their test methods, and GSO EN 40-5:2011 for steel lighting columns, including wind load and impact performance. The project specification states which applies.

Keep reading.

  • Curtain wall, structural glazing or window wall

    A curtain wall is a glazed building envelope fixed to the structure: it must be stable in itself but does not carry the building. A window wall is glazing installed between the floor slabs, floor by floor. Structural glazing is a way of fixing glass rather than a wall type: the glass is bonded to its frame with structural silicone.

  • Demountable partitions vs gypsum board

    A gypsum board partition is built on site in stages: framing, boards, taped joints and paint, and it is demolished when the layout changes. A demountable partition is made in a factory and assembled on site, so it can be taken down and rebuilt elsewhere. Line Systems PA 100 Opaque is designed as the modular alternative to gypsum walls.

Apply it to your project.

Bring the drawings. BSI will turn the principle into a specification for your building.

Enquire Email