PMO and QA/QC, in one team.
BSI's project management office (PMO) governs the schedule, budget and risk of each project, and its QA/QC applies ISO-aligned inspection and material traceability. Logistics run under the same PMO, so programme, cost and quality are managed in one place for every scope, from structural works to fit-out.
What's included.
Governance over schedule, budget and risk, with ISO-aligned inspection and material traceability.
Schedule
One programme for every scope, governed by the PMO.
Budget
Cost governed alongside the programme.
Risk
Project risks managed by the same PMO.
Logistics
Deliveries run under the PMO, not beside it.
ISO-aligned inspection
Inspection aligned with ISO practice, on every scope.
Material traceability
Certified materials, traceable through the project.
The promise it keeps.
On-Spec
Certified materials, engineered detail.
On-Time
PMO-led governance and logistics.
One PMO holds the schedule, budget and risk for every scope, so the handover date has one owner.
On-Value
Lifetime performance, single accountability.
Prepare the session.
Bring what you have. None of it is required to start, and BSI engineers fill the gaps with you.
- The scopes you want BSI to deliver or manage
- Target handover date or the programme
- Budget framework, if set
- Quality requirements or the project's QA/QC plan
Where it applies.
- All seven contracting scopes
From structural works to lighting poles, all under one PMO.
Related services.
Design and engineering
Façade and building-envelope engineering, from concept to construction-ready drawings.
Supply chain
Certified materials and specialised systems, traceable and delivered under one PMO.
After-sales and warranty
A structured warranty, preventive maintenance and upgrades after handover.
Questions, answered.
What does BSI's PMO manage?
Schedule, budget and risk, together with the project's logistics.
How does BSI's QA/QC work?
Through ISO-aligned inspection and material traceability, with certified materials and engineered detail.
Does one PMO cover every scope?
Yes. Every BSI scope, from structural works to fit-out, runs under one PMO, so there are no coordination gaps between trades.
Plan your project.
Share drawings or a brief, and BSI engineers review scope, standards and programme with you.