PMO and QA/QC, in one team.

BSI's project management office (PMO) governs the schedule, budget and risk of each project, and its QA/QC applies ISO-aligned inspection and material traceability. Logistics run under the same PMO, so programme, cost and quality are managed in one place for every scope, from structural works to fit-out.

Where this service sits in a project's life: PMO and QA/QC.Schematic, not to scaleSource: BSI company profile p.04, p.23

What's included.

Governance over schedule, budget and risk, with ISO-aligned inspection and material traceability.

  • Schedule

    One programme for every scope, governed by the PMO.

  • Budget

    Cost governed alongside the programme.

  • Risk

    Project risks managed by the same PMO.

  • Logistics

    Deliveries run under the PMO, not beside it.

  • ISO-aligned inspection

    Inspection aligned with ISO practice, on every scope.

  • Material traceability

    Certified materials, traceable through the project.

The promise it keeps.

  • On-Spec

    Certified materials, engineered detail.

  • On-Time

    PMO-led governance and logistics.

    One PMO holds the schedule, budget and risk for every scope, so the handover date has one owner.

  • On-Value

    Lifetime performance, single accountability.

Prepare the session.

Bring what you have. None of it is required to start, and BSI engineers fill the gaps with you.

Discuss your project
  • The scopes you want BSI to deliver or manage
  • Target handover date or the programme
  • Budget framework, if set
  • Quality requirements or the project's QA/QC plan

Where it applies.

1542367
PMO and QA/QC: the scopes it supportsSchematic, not to scaleSource: BSI company profile p.04
  1. Design and engineering

    Façade and building-envelope engineering, from concept to construction-ready drawings.

  2. Supply chain

    Certified materials and specialised systems, traceable and delivered under one PMO.

  3. After-sales and warranty

    A structured warranty, preventive maintenance and upgrades after handover.

Questions, answered.

What does BSI's PMO manage?

Schedule, budget and risk, together with the project's logistics.

How does BSI's QA/QC work?

Through ISO-aligned inspection and material traceability, with certified materials and engineered detail.

Does one PMO cover every scope?

Yes. Every BSI scope, from structural works to fit-out, runs under one PMO, so there are no coordination gaps between trades.

Plan your project.

Share drawings or a brief, and BSI engineers review scope, standards and programme with you.